Bathroom Remodeling
The part of a bathroom that matters most is the part you never see. We waterproof properly, then tile over it.
- Licensed and Insured
- BBB Accredited
- Family Owned Since 2004
- Licensed Electrician On Staff
- Free Estimates
- Overview
Bathroom Remodeling in the Denver metro
Bathrooms fail from the inside out. A shower that was tiled straight over green board instead of a proper waterproof membrane will look fine for two years and then rot the framing behind it. By the time it shows on the outside, the repair costs more than the original remodel.
We build showers the way they are supposed to be built: sloped pan, waterproof membrane, seams sealed, tested before a single tile goes on. Then our tile crew sets the finish work, our plumbers set the fixtures, and Izac handles the exhaust fan, GFCI circuits and lighting.
We remodel everything from small powder rooms to full primary suites, and we do a lot of walk-in shower conversions for Denver-area homeowners replacing a tub they no longer use.
What's included
- Walk-in shower conversions, replacing an existing tub
- Shower pans, waterproof membranes and proper slope
- Floor, wall and shower tile, including large-format
- Vanities, tops, sinks and faucets
- Toilets, tubs and freestanding soaking tubs
- Shower glass and frameless enclosures
- Exhaust fans, GFCI outlets, vanity and mirror lighting
- Supply and drain repiping where needed
- Our Process
How the job actually runs.
Assess
We look at the existing bathroom, check for signs of past water damage, and confirm what is behind the walls before quoting.
Plan & select
Layout, then tile, vanity, fixtures and glass selected and ordered.
Demo & waterproof
Old finishes out, any rot repaired, plumbing and electrical moved, then the pan and membrane installed and tested.
Tile & finish
Tile set and grouted, vanity and fixtures installed, glass measured and hung, paint and trim finished.
- Questions
Bathroom Remodeling FAQ
How long does a bathroom remodel take?
A standard hall bathroom is usually two to three weeks. A primary suite with a custom tiled shower and glass runs three to five weeks, since shower glass is measured after tile and takes about a week to fabricate.
Can you convert my tub into a walk-in shower?
Yes, this is one of our most common projects. We remove the tub, reframe and re-slope the floor, move the drain, waterproof the new pan, and tile it. Curbless entries are possible depending on your floor structure.
What if there is water damage behind the tile?
We find it during demolition and show you. Rot repair is quoted separately because there is no honest way to know the extent until the wall is open, but we will always show you the damage before doing the work.
Do you install shower glass?
Yes. Glass is templated after the tile is finished and set so it fits the actual opening rather than the plan.
Free estimate
Tell us about your project and we will call you back the same day.
- Also From A&I
Other services.
Full Home Remodels
One crew, one timeline, every trade handled in house.
Kitchen Remodeling
Layout, cabinets, counters, tile and lighting, all in house.
Basement Finishing
Framing, egress, electrical, plumbing and finish carpentry.
- Free Estimates ยท Denver Metro
Ready to get a real number on your project?
Tell us what you have in mind and we will come look at it. Free estimates across the Denver metro, and we reply within one business hour during working hours.