A&I Contracting

Home / Services / Flooring and Tile

Flooring & Tile

Flat subfloor first. Everything else โ€” hardwood, LVP, tile โ€” depends on what is underneath it.

Flooring and Tile in the Denver metro

Almost every flooring failure traces back to the subfloor. Tile cracks because the substrate flexed. LVP separates at the seams because the floor was not flat enough. Hardwood cups because it was installed before it acclimated. The finished floor is only as good as the preparation under it.

We check the subfloor for flatness and moisture, add underlayment or self-leveler where it is needed, and let material acclimate before installing. It adds a day. It prevents the callback that costs a week.

We install hardwood, luxury vinyl plank and tile, and we refinish existing hardwood โ€” which is often the better value when the original floors are solid and just tired.

What's included

How the job actually runs.

01

Check the subfloor

Flatness and moisture measured, squeaks fixed, damage repaired before anything else.

02

Acclimate

Wood flooring sits in the house until its moisture content matches the space.

03

Prep

Leveling compound, underlayment or backer board as the material requires.

04

Install & finish

Material laid, transitions set, trim installed โ€” then sanded and finished if it is hardwood.

Flooring and Tile projects.

Hardwood floors denver living room
Hardwood floor refinishing denver
Hardwood flooring installation denver
Lvp flooring installation denver
Luxury vinyl plank install denver
Bathroom remodel denver patterned tile

Flooring and Tile FAQ

Should I refinish my hardwood or replace it?

If the boards are solid and have enough thickness left above the tongue, refinishing costs far less and the result is a genuinely new floor. We check the thickness and the condition before recommending either.

Typically three to five days for sanding, staining and finish coats, plus cure time before furniture goes back. Oil-based finishes need longer to cure than water-based.

Yes โ€” it is one of the best. It handles the moisture variation of a below-grade slab far better than hardwood or laminate, and it is warmer underfoot than tile.

Yes, electric radiant mats under tile. It is worth doing in bathrooms, and the wiring is handled by our licensed electrician.

Free estimate

Tell us about your project and we will call you back the same day.

Name

Other services.

Full Home Remodels

One crew, one timeline, every trade handled in house.

Kitchen Remodeling

Layout, cabinets, counters, tile and lighting, all in house.

Bathroom Remodeling

Tile, waterproofing, vanities and walk in showers done right.

Ready to get a real number on your project?

Tell us what you have in mind and we will come look at it. Free estimates across the Denver metro, and we reply within one business hour during working hours.

Scroll to Top